Thursday, March 29, 2012

Report of Regional Meeting & Inauguration Cruz del Palmar


Where: Casa of Cata in Cruz del Palmar (& 3 other family casas)

When: March 29 2012 11am – 4.20pm

Who: Chela, Holly, Saul (Cedesa) Laura, (Rotary), + more than 158 people.

Purpose:

  1. Regular Regional meeting of the now 22 communities part of the Consejo – Cocira formed as a result of the Water Cistern Project.
  2. Inauguration of the 41 cistern project part of the Global Grant 25437 funded by Calgary RC & Alberta CIP & combined with Direct grants from Tallahassee RC, Port Lavaca RC & private donations, as well as excess funds from previous water cistern projects.

Holly & I arrived a little late at 11.40 & the meeting was in full process. There was a huge gathering of people seated & standing & participating in the discussions.

The roll had already been “called” & a list of communities & numbers of representatives was already made. Attendance was listed as follows:-

Corralejo 5, Pena Blanca 18, Capaderillo 3, La Tinaja 16, Tierra Blanca 3, Artesanos 3, Juan Gonzalez 17, Palmita II 14, Vivienda de Arriba 4, Villa de Guadalupe 8, Vivienda Urbana 5, Guerrero 2, Magueyes 2, Presita de Santa Rosa 10, Los Torres 3, San Lorenzo 3, Cienega 5, Cruz del Palmar 31, Montecillo de Nieto 4, La Joya 1, Banda 1. (there were more late arrivals but these were not recorded by community).

The Co-ordinator had been chosen – Roberto & record takers were taking notes for each community as well as for the Consejo.

The agenda had been decided & listed:

  1. Presentation & Introduction
  2. Programing of regional meetings, micro regional meetings & community direct attention assemblies.
  3. Sanitarios secos update re resources
  4. Cistern project – inaugurations/ next project with Sapasma
  5. Pipa Communitario
  6. Diplomado de turismo Rural
  7. Report re Codecin
  8. Inauguration of 41 cisterns at Cruz del Palmar

Item 1:This had already taken place (hence the list of attendees above)

Item 2: Programming of regional meetings, micro regional meetings & community direct attention assemblies.

After some discussion it was agreed that micro regional meetings were ideal to discuss issues closer to each community & with smaller more productive groups enabled. The list of micro regions was drawn up, & each decided when they would next meet, they will meet on a 2 monthly basis.

Regional meetings will be held every 3 mths (ie qtrly) unless there is a special meeting called.

Community direct attention/organisation assemblies will be every month with Saul or Chela attending each one.

Traspatios (backyard production) & health workshops will continue in each of the communities that wishes them, with other Cedesa “specialist” promoters, ie Juana for health, & Benigno for backyard production.

The special training workshops will also continue at Cedesa, with the next one being on alternative construction techniques, this one is aimed at the young men, many of whom are currently unemployed, to teach them inexpensive alternatives to the normal brick construction. They will learn rammed earth techniques as well as adobe. The idea being as a team they can assist eachother to construct housing for themselves. Traditionally young men in this state go to the USA to accumulate enough money to begin to build themselves (& their new families) a house. We know how fraught this tradition is & in attempt to offer alternatives this new workshop is being offered.

Micro region 1 – close to the Presa. Next Meeting 18/4 10am at Vivienda Urbana

Capaderillo, Guerrero, Vivienda Urbana, Presita de Santa Rosa

Micro region 2 – Next Meeting 16/5 10am Montecillo de Nieto

Montecillo de Nieto, Los Torres, Cruz del Palmar, Banda, Artesano, Magueyes

Micro region 3 – Next Meeting 25/4 Juan Gonzalez 10am

Vivienda de Arriba, Tierra Blanca, Juan Gonzalez, San Lorenzo, Villa de Guadalupe, Cienega, La Joya

Micro region 4 – Next Meeting 23/5 10am La Tinaja

Corralejo, Cinco Senores, La Tinaja, Palmita II, Pena Blanca

General Assemblies, or Regional meetings will be every 3 mths, the next one June 28/6 at Guerrero 11am.

Item 3: Sanitarios Secos

The work continues on this project, the funding has been promised but they are still working through all the requisites to receive the $$ & begin the actual project.

Item 4:

Cistern Project Inaugurations:

Cruz del Palmar today, La Tinaja Tues 24/4 at 11am, Guerrero Sat 28/4 at 11am (3 Esquinas to be advised).

A commission from Cocira will attend the inauguration in Guerrero in solidarity.

Sapasma next project:

Holly advised Waldo has said a next Sapasma project is likely within the next 2 months. Sapasma currently has a policy of providing cisterns only to communities without water, not to communities with Contaminated water, Cocira would like to discuss this with Sapasma, ie to see whether this can be changed, as it is essential that people with contaminated water have access to safe drinking water, even if they have well water for domestic use.

A list of priority communities was created, but depends on the existing policy of Sapasma & whether that can be changed.

Action: water tests need to be done at the following communities – ie not yet tested

La Joya, Corralejo, La Tinaja, Palmita II, Vivienda Urbana. The cost to the communities for these tests is $300 pesos, $150 for arsenic test & $150 for Fluoride test. These costs are to cover the consumables for the Cedesa Lab ie bottle, testing strips, chemicals etc. Chela asked that each community ask families to contribute even 5pesos each, to cover these costs.

Item 5: Pipa Communitaria

It had previously been proposed by Sapasma that a plan for the Consejo to operate their own Pipa (water truck) for deliveries of water to their own communities could be put into place. This has been discussed at great length in previous assembly & each representative has spoken with their communities. Each of the communities were asked to comment & vote on the proposal, there were many comments, “the purpose of cisterns is to collect rain water, which is pure water, it makes no sense to fill the cisterns with other water & will be very complicated to administer” “we don’t know the exact costs but we know it is likely to be expensive & it will be very complicated” “we just want rain water or people will not value it & will waste water” “it will be too complicated, we are many communities & it will be difficult to administer & control” “I don’t think it is viable with all the issues that could pop up, like a broken pump, no electricity, lots of potential expenses” “lots of responsibility & a lot of work” “difficult to prioritise deliveries, we could have lots of people wanting water at the same time & this would mean competing against eachother, & risking solidarity”

The vote was unanimously “NO”.

A commission will go to Sapasma to explain the reasons for “NO” vote & make alternative suggestions for resolving the issues - & work hard on getting existing Pozos(wells) functioning – in Los Torres, Cienega & Montecillo de Nieto – this will cut down the number of families without water significantly.

Also, extra pipa deliveries need to be asked for for the communities without water in Villa de Guadalupe for example.

At this point an additional item was added – discussion on ethics & values. Chela worked with the crowd to discuss the value of working hard to improve your community & your region, working with good heart & good conscience.

Item 6: Diplomado de Turismo Rural

Cedesa is hosting another rural diploma similar to the water one held 2008/09. It is described as follows:

Diploma course on Sustainable Rural Tourism, taught by Dr. Felipe Macias, University of Guanajuato (Social Science and Humanities)

Module 1 – social organization

Module 2 – sustainable energy in the rural environment

Module 3 – Territory and natural resources

Module 4 – Gender, environment and sustainable development

Module 5 – Landscape and special aspects of the countryside

Module 6 – Reception, services and goods to offer to visitors

Northern Guanajuato is diverse, not only because of its people and the natural reosuces, but also because of the ecology that provides food, medicine, fuel, rest, tranquility and recreation for its inhabitants. Without a doubt, rural areas have much to offer the urban population, including goods and services and the opportunity to share knowledge and experiences. Campesinos are the ones who protect, maintain and take care of natural ecosystems, especially the water, soil, flora and fauna and cultural heritage. Rural tourism includes actions that teach/confirm respect for the environment and natural resources as well as an opportunity for campesinos to improve their socio-economic situation.

Item 7: Codecin – Coalition of the Cuenca

Cedesa & representatives from Cocira are part of a coalition of the Cuenca (the region that includes the 7 municipalities sharing the same aquifer). They are working on various issues including maintaining conservation & defence of the aquifer & defence of the native seeds. This coalition is made up of many national organisations & is beyond just San Miguel.

At this point the assembly concluded & the Inauguration began.







Cata described the agenda which included first a banquet & rest & relaxation (after the long meeting), we then headed off to visit 3 cisterns nearby.

The 41 cisterns in this community were completed in record time, 3 wks to construct all the cisterns, which is an average of 2 cisterns per group per week.

The participants receiving the cisterns spoke their thanks at each of the houses. A huge thanks was extended to Rotary both local San Miguel & the international clubs who have made this project & continuing process possible. The speakers spoke with love about their cisterns & the difference it will make to their lives.









Two of the cisterns had been amazingly decorated. The first one had a very cute cobbled path around the circumference of the cistern, with another width of garden defined by large jagged rocks. The garden was filled with lillies & the cobbled path included specially selected rocks found in the dry river bed nearby. They had even created a little bridge going over the space where the water from the discharge would flow when they clean the cisterns out…There was also a little stone carved deity which they had found while excavating dirt to make the tepetate bricks in the area, he was placed looking over the tap. It was topped off with a full glass bottle of coke, & the woman joked that when her children & grandchildren come to visit they will be very happy to drink fresh water instead of the unreachable coke.

The last cistern was also incredibly decorated, this one had coach lanterns placed evenly around the top rim of the cistern, it was surrounded by a ledge of cement with little stone carvings placed evenly watching, it was topped off with a very ornate metal cross with a plastic baby doll attached, & with a terracotta bird watching on.

There were streamers & balloons & a ribbon strung across a metal arch way… Chela asked me to say a few words, I was choked up & could barely get any out but managed to congratulate the large crowd on their accomplishments in the last 3.5 yrs, beyond just the water cisterns, to have organised themselves to continue to have council meetings of this size & continue to work on their issues is a mammoth achievement.

Chela spoke & explained this is likely my last project since I am moving to Mexico City with my family. I invited them to visit us in Mexico City & couldn’t get any more words out with tears streaming. Flashing past were many memories of where this all started, all the zillions of emails & huge support from Bill Webb in Tallahassee & the many other clubs, Districts, Foundation & organisations that have supported these communities. How these communities continue to have faith that their work will be rewarded & how it has been.

The ribbon was cut & confetti was tossed. Cheers went up, & Holly & I made our excuses & raced off.

I really wish that Bill, Norman, Skip & all the members from all the other clubs that have been involved in this project from the start could have been there with us, but actually in a huge way you all were!!

Love

Laura

(As an addendum, 3 of the women from Los Torres were at the assembly, they bought with them a list of 12 more families who would like to receive cisterns, this will bring the total to 82 out of 91 families, & will be the last phase – we have decided to include them in this final project, bringing the project full circle – Los Torres is where we started & will be where we finish this final project – ay carray!)

Saturday, March 17, 2012

Update re Global Grant 25437 Calgary Water Cistern Project (with Direct grant combined)

4 Communities led the first phase – La Tinaja, 3 Esquinas, Cruz del Palmar & Guerrero. Following is the update of these communities:-

La Tinaja 22 (21 family + 1 pilot) cisterns, pilot began on 23rd Jan. Cisterns are almost all completed & they will announce their inauguration on the 29th March.

3 Esquinas 24 (23 family + 1 pilot) cisterns, pilot began on 30th Jan. Cisterns are completed, they are yet to announce their inauguration date.

Cruz del Palmar 41 (39 family + 2 pilots) cisterns, pilot began on 30th Jan. Cisterns are completed, Inauguration to be on 29th March.

Guerrero 20 (19 family + 1 pilot) cisterns. pilot began on 6th Feb. Interruptions on 7th March re land dispute, but almost completed as at 17.3.12.

The next phase includes communities of Corralejo, Vivienda de Arriba & Tierra Blanca.

Corralejo 15 (13 family + 1 pilot+ 1 community proj) cisterns, they began their pilot on 12th March. This was a difficult pilot as most of the men are absent from this community in the USA, Filiberto & Saul (our tech assistants) admitted to having to work extremely hard with the women in this community, since there were no men to help out.

Vivienda de Arriba(10) & Tierra Blanca(9) are beginning work on their cisterns on the weekend of 17th March. They will proceed without a pilot training session, as this is phase II in each of these communities & the previous cistern recipients have volunteered to work with these participants.

Once funds are received from Port Lavaca & converted to Pesos, we will have a firm number of the next cistern/materials to be available & will begin on this final phase.

Wednesday, March 14, 2012

14th Mtg of the SMA Midday Rotary @ Vivienda de Arriba& Tierra Blanca re water Project

Record of Event

Where: Vivienda de Arriba – courtyard of church(40 mins from SMA)

When: 14th March 2012 1.40pm – 3.20pm

Who: Chela, Holly & Saul, (Cedesa) Laura, (Rotary), + 27 adults (incl. 7 men) & 10 kids & 2 dogs…

Purpose of assembly: To plan the next phase of the GG/Direct grant Water Cistern project which will be 19 more cisterns in Vivienda de Arriba (10) & Tierra Blanca (9).

Note: Re Guerrero : today’s assembly was postponed from March 7, as on that day there was an issue in the community of Guerrero which Chela & Saul needed to attend to. Guerrero is another community we have been working in. There are 12 families whose land is currently in dispute.

On March 7th a lawyer, earthmoving equipment & 50 police turned up to evict & bulldoze the house of at least one of the families.

Many people came in support of the families, including representatives from communities of the Citizen’s council – Cocira (formed by as a result of the water cistern projects).

It was stated by a member of the community that this was a rare event, ie to see other communities supporting one another, & was due to the organizational process of the water projects over the last 3.5 yrs.

As a result of the solidarity provided to the community, the lawyer decided to call off the earthmovers & the families are still in their homes.

Rotary has stayed out of the legal battle, but it should be noted we have continued to support the families to provide them with safe drinking water as the level of fluoride in this area is very dangerously high at 4+mg/l…

As an aside, at least one family mentioned that not only were they born on this land, but also their father & grandfather. There has also been a countersuit (filed co-incidentally the same day as the eviction notice was received), stating that the judge & the complainant have been colluding at the house of the complainant.

Regardless, the 19 (+1 pilot) cisterns in the community of Guerrero are almost completed & we continue our mission to assist people to resolve their drinking water situation.

When Vivienda de Arriba & Tierra Blanca community members heard the assembly of March 7 was postponed (& why) they decided to go to Guerrero to support their neighbours.

Consequently the first part of the assembly was a debrief of the current situation, Saul also read out an article that appeared in the newspaper Sol del Bajio on 14th March describing the situation in Guerrero on the 7th March.

The assembly moved onto usual routine.

Chela asked for a show of hands as to who was attending from Tierra Blanca & who from Vivienda de Arriba.

VdA had 15 people attending & Tierra Blanca had 16 (& more arrived later, not sure if Vda or TB)

Call for a co-ordinator & record taker for each community was made…

Lorena was appointed co-ordinator, & there were 2 record takers.

Page 2 of 2

Chela asked why everyone was here…

The response was “about the cisterns, to make agreements as to who will receive them”

“to define the training sessions, time & who”

There are 10 on the list for Vivienda de Arriba (with more waiting) & 11 on the list for Tierra Blanca.

They have already organized themselves into work groups (each community will work in one group). This the 2nd phase for each of these communities, so they are already very aware of what is involved, & even better are happy to support their fellow community members & work with them to train them. Saul will of course still be visiting to ensure there are no issues, but this is an excellent result & more evidence of community building.

Anna – from Vivienda, mentioned there are 8 more people who would also like cisterns, Chela asked if they were current residents or were away in the USA working – reiterating that the project was not just a cistern project but involved participation in the process , Anna said they were local & have been participating.

We asked how each of the communities had “prioritized” the participants, ie there are more people wanting cisterns than we have cisterns available. Vivienda de Arriba decided based on attendance at meetings, & Tierra Blanca had had a “raffle” (drawing straws). Tierra Blanca advised that there are at least 38 people still wanting to be involved in the cistern project, of which we had mentioned 11 cisterns were available…

The situation currently is that we have only materials for 35 extra cisterns (although we have funding for more materials)… the materials are special order & have a lead time as much as 3 wks depending on the factory, hence our supplier had ordered in advance sufficient materials for 35 more cisterns & so we have had to split into additional phases.

When we receive the additional funds promised from Port Lavaca Rotary Club we will be able to place the next order of materials & therefore have another meeting with Tierra Blanca (& maybe VdA) to allocate the next number of cisterns. (ay carray – life is complicated!)

It was decided by VdA that no pilot training session was necessary, that past cistern builders would assist the newbies. Tierra Blanca initially decided to do a pilot at the Kinder (39 kids) then decided to give it to one of the families on the list instead, & do without a pilot training session.

We mentioned the tools required, & they all knew what was needed (in fact Anna was listing them out loud from memory) & they all have them or can borrow them.

They decided they would like to get started this weekend & so asked if I could order & pay for the materials in time for delivery on Friday. (which I have done).

Contact details were given for the driver – ie the driver calls the first person & that person guides him for deliveries to each of the houses on the list in each of the communities.

Saul mentioned we have sufficient Plywood left from previous projects, order for Sand & Gravel was made on the following day, & order for the doors will be made once we have final cistern numbers (since the process of ordering the doors is a little more complicated).

The meeting came to a close approx. 3.20. We then headed over to Anna’s place for tacos of nopal & chicheron with boiled eggs – yum!!