Friday, December 14, 2012

Los Magueyes and La Palma Exploratory Meeting – 14 December 2012



Attendance: Saul Juarez and Holly Yasui from Cedesa
Denis Beaudry, Alejandro Guerra and Lee Carter from Rotary San Miguel Midday
Veronica Gonzales and Juan Cervantes, Lilia Luna and Juan Juárez[YUN1] , Anastasia Paolino, Arturo Juarez, Rafael Juarez y Lucina Gonzlaes, Filomeno Juarez, Gloria Martinez, and Beatri Ramirez from the community of Los Magueyes
Maria Juarez, Susana Morales, Ma. Socorro Juarez, Patricia Ramirez, Cristina Ramirez, Ma. Guadalupe Juarez, Norma Zapatero and Ma. Elena Ramirez from the community of La Palma
Not in attendance but represented: Concepción, Estela Munoz and Eulalia Granados

Attending from the communities: 14 women, 4 men and multiple children.

The meeting was called to order at 4:20 pm. The meeting began with an introduction of all persons in attendance. The order of the day was set:
1.       Presentation from CEDESA
2.       Introduction of the project and its importance to the two communities
3.       Introduction of Rotary International and Midday Rotary
4.       Requirements and Commitments required of the project.


Each participant offered their viewpoints of the problems with water for their communities. The important points discussed were lack of water, contaminated water, minerals in the water and taste of the water with chlorine added.

Saul (CEDESA) presented the history of the cistern project in San Miguel that includes 587 cisterns spread out through the area. Saul emphasized that each drop of water is sacred and that water harvested into the cisterns should only be used for drinking and cooking. Twenty-two communities have banded together through the water harvesting and other projects, and they have formed the regional organization, COCIRA (Consejo Ciudadano Rural de Agua – Rural Citizens Council on Water), which brings these communities together as a single voice in analyzing and prioritizing their needs, making plans to resolve problems and presenting their case as a single voice to municipal authorities and other organizations. The participation in COCIRA will lead to further advances for these communities (example: dry toilets, training in food production and processing, health workshops). It is the responsibility of COCIRA which has one representative and one alternate from each community, to manage the community needs and set priorities for the represented communities. (The community development part of this water project is as important as the cistern itself.)

The state of the aquifer underlying the municipality of San Miguel was discussed and it was recognized that this precious resource is rapidly being depleted. Many families and communities have no access to water whatsoever except for erratic deliveries by the municipal government to fill barrels and plastic tubs. For the communities that have a well to provide them water, it is increasingly contaminated by Fluoride and Arsenic. In high concentrations, these minerals cause numerous health problems, most notably dental fluorosis (staining and deterioration of the teeth, general indicators of bone deterioration) and cancer. The most recent test of the well water at La Palma showed that it exceeded limits set by the Mexican government and the World Health Organization. It was pointed out that every year the concentration of these minerals in the aquifer increases as its water continues to be depleted.

The community members at this assembly understood that it is a requirement of this type of project that the cisterns be built in mutual-aid groups, which will decide rules of participation; that the building process requires 4-8 weeks; and that to have a cistern, the family must live full-time in the community and have 25 square meters of roof to capture rain, and a ground space of 3 x 3 meters for the cistern itself.

The members of the community presented their prioritized list of families to receive cisterns: 14 confirmed and 5 on the waiting list. The list was made by considering necessity (no water in Los Magueyes) and participation in the project by attending meetings, helping with the organization and willingness to participate in the work teams. It was explained that funding would be sought for 14 to 19 cisterns.

This is the prioritized list of families to receive cisterns as decided by the group.
Los Magueyes
1- Lilia and Antonio Luna
2- Veronica y Juan Juárez
3- Anastasia Paolino
4- Arturo Juárez
5- Lucina y Rafael Juárez
6- Filemon Juárez
7- Gloria Martínez
8- Beatriz Martínez

La Palma
9- María Suárez
10- Susana Morales
11- Ma. Socorro Juárez
12- Concepción Mojica
13- Ma. Guadalupe Juárez
14- Patricia Ramírez
15- Ma. Elena Ramírez
16- Cristina Ramírez
17- Norma Zapatero
18- Estela Muñoz (not present)
19- Eulalia Granados (not present)


Lilia’s husband was there too, in and out, but I don’t know his name - 

Saturday, June 9, 2012

Record of Event 46th Event of the SMA Midday Rotary Water Project Los Torres


Where: Los Torres Primary School
When:  6.6.12 12midday to 4.40pm
Who:  Saul,Chela,Holly,Abel (Cedesa), Gary, Lee, David, Enrique, Lisette, Don, Laura (+ Steve & Visitor Carly from New Zealand) (Rotary), approx. 500 adults plus 100+ kids from 22 communities

Warning – long report – last inauguration is the excuse!
Purpose: I was led to believe the purpose of the day was inauguration of 14 cisterns of the final phase in Los Torres, full circle from the first visit in late 2008 & first project early 2009.

We Rotarians arrived in convoy to Los Torres approx. at midday.
Many people were already gathered, lots of pick ups parked trying to snatch any little shade from small mesquite trees. A huge tarpaulin was strung over a rows of small school chairs, most already occupied, tables were placed to receive the large enamel pots & buckets of tortilla’s wrapped in embroidered cloths to stay warm!

Balloons alternating pink & white were strung over the entrance, a large group of small girls rushed me & each one giving me a hug.

There were posters of photos of all the famiies in Los Torres proudly standing in front of their cisterns, & groups of small children gathered pointing out their families, or laughing at their photos.
We only began the tradition of each family photographing their cisterns in one of the later projects, but Los Torres had decided to go back & photograph each of their families – 84 – lots of posters!!

Concha & Chuy the 2 women who have been instrumental in organisation in this community from  before we even arrived with our projects, gave me welcoming hugs & then spun off to busy-ness readying things, Holly & huddles of other women dotted around from many other communities.

We mingled, chatted, & shook hands with more than 100 people, before miming shaking hands with the rest – realising we’d be there all day if we continued. This was shaping up to be a massive final inauguration.

Pages of info on each community were strung in plastic sleeves on a rope high up across the entrance. Men were lingering in any shady spots they could find replete in their best western shirts, embroidered belts & cowboy hats, I greeted those I recognised, with a general nod of acknowledgement to the others. Other men were carrying huge pots of barbacoa (lamb/sheep) cooked in an underground oven, with steaming large banana leaves – hmm looking forward to that!

The teachers had the children ready & primed with sound equipment in place to begin, a long table decorated with beautifully embroidered cloths & special florist bouquet arrangements of carnations & greenery – I fleetingly thought, how had they gotten those all the way out here in the desert (special trip?)…

More hello kisses & hugs from all the faces I recognised from the many events, assemblies, project days, & regional meetings that we had now amassed between us. Familiar eyes, aprons, special earrings for special events, everyone in their finest.

Gary laughed & asked me if I was running for president? I dismissed him with a nervous laugh & wondered what the heck he was talking about. He asked if I’d seen the electoral poster with my name on it, again I kind of laughed & moved onto other hellos…

I looked up & saw a photo of me from the Tierra Blanca project, Saul & I had tried to take a photo of a particularly old woman, in her fine apron & ready for work with a big hat on. She had refused to smile, so we made it our business to steal one from her. We had cajoled, explained & even pleaded, all the time being met with a staunch refusal… I snuck round beside her & wrapped my arm around her shoulder, then I tickled her ribs, & she couldn’t help it, a smile broke across here face & Saul just managed to catch the last of it…& one of me throwing my head back in a fit of laughter… Anyway, this apparently was my election poster, along with slogan “Laura si cumpli” (loosely translates to – she keeps her word).  There was a resounding clunk & I realised – oh my god, they are honouring me here today!!

A wave of panic came over me – how can I get out of this? rushed into my head… This should not be happening, we should be honouring the team & the communities, this is wrong… I’m sure I flushed an instant magenta! Finally (30 seconds later) I thought, oh well, hopefully it will be short & sweet & this has involved massive organisation & co-ordination, I have to respect their efforts…

Well, so it began, we were asked to take our place at the big table, & the presentations started.
Gifts were presented to me from many communities, a huge glass jug & glasses, a picture of a lush garden, a tin lizard & miniature wheelbarrow, a box of hand painted mugs! Hugs & tributes, I’d already begun crying, this was going to be long!

There were dances by adults, dances by kids, speeches of gratitude, retelling the stories, long crushing hugs, Concha led the proceedings announcing each of the next items, each of the communities were asked to do the chant…bim bom va – each community was called out in turn, stood up where they were & chanted the bim bom va chant ending with “laura, laura Ra Ra Ra”, this lasted an excrutiating lifetime, while every community yelled their loudest! There were even people from Palencia & 3 Esquinas in the municipality of La Paz 2 hours away!

Then more speeches, including one composed by Ivar & read in his absence in English by Gary, & in Spanish by Lee, with David standing beside us holding up a photocopied lifesized mask of Ivar’s face over his own (on a paddle stick) – thank god for that, everytime more tears came bubbling, I looked at Ivar’s smiling 2D face on David’s lanky frame & couldn’t help but laugh. I was presented with a certificate, a pen to continue writing & beautiful silver cuff from Ivar & Paty (exquisite scandanavian style!)

This continued for what must have been an eternity for the kids standing in full uniform & full sun, as more speeches, (tears fully streaming as Chela recounted our team exploits & gave thanks for our collaboration) songs & dances were performed, & eventually this all concluded, after some hilarious solo songs by a couple of older women, & the banquet began.

Plates of steaming pozole, rice, chicken mole, barbacoa, tortillas (still warm!), large jugs of juice water, until we couldn’t eat any more…

People ate, Chela called a meeting in a different part of the school (she can’t help herself, never miss a chance to organise!). We found a knife (the barbacoa one hastily cleaned & pressed into service to) cut the 2 huge cakes bought by Rotary, into a million pieces to make sure all that line up got some… David dished out serviettes & whispered, cut them smaller Laura, there’s a lot of people! The kids (&
some adults) lined for ½ hr waiting patiently for their little piece of cake, it took me a while to realise that the usual “can I have a bigger piece?” which would have been the norm in our culture didn’t happen, each recipient was happy with whatever they received, not one asking for a bigger piece, even if some were only crumbs – it struck me additional confirmation, these humble people have no expectations, & are just so grateful to receive anything.

Rotary colleagues peeled away, many people from the communities piled back onto the pickups, with empty containers & full tummies, huge hugs & calls of “don’t forget us, & remember you’re always welcome in our community” as they drove away in clouds of dust… Holly &  I walked to find the cistern whose ribbon we were to cut.  Eventually we all gathered (the families in Los Torres involved in this final phase, bringing the number of cisterns in Los Torres to approx. 96% of the number of families! We cut the ribbon, hugged, cried, laughed. I lingered a little longer to hear the extreme gratitude & pride of the woman who’s cistern this was. Her husband spoke very good English with a very strong accent – he had, it turned out – been in Florida for 22 years!

I asked the woman if she had children, she said only 2, she would have had more but her husband left , she spoke with sadness retelling how he had only returned 8 mths ago & had left when her daughters were 3 & 5, the oldest was standing there today a mother herself! The woman had tears in her eyes, & a stoic strength about her. We walked to her gate, through her proud garden, geranium cuttings & plants in cans,  she retold – for my ears only – how she had raised those children solo, here in this desert with no money & support for 22 yrs – she had not been part of the previous phases as she didn’t have the requisite time to commit to the participation, & she was sooo relieved & grateful to finally have a cistern, despite the absence of her husband… We hugged & I felt an overwhelming rush of her pain & strength with massive sadness, having been deserted & yet a sense of I survived – but did it have to be that hard…

What a day! What a project!! – this has been an amazing journey for all involved, the communities, the Rotarians here & away, the team!! We have all grown beyond description & know so much more than that first hot dusty day we came driving into Los Torres in 2008 – who would have guessed!!!

LOVE
LAURA

Wednesday, May 16, 2012

In summary at the conclusion of the Water Project


It’s been a long but seemingly fast, journey from the initial needs analysis carried out by Bob & I in Aug-Nov 2008 until now…

There are huge thanks to be doled out - I’ve done my best to recall all the info/stats/data for the last 3.5 yrs forgive me if there are any omissions.

A BIG THANK YOU to all the hardworking men & women belonging to the Rotary Clubs & Districts & the Foundation who have been part of this solution:

Ann Arbor RC USA
Baton Rouge Capital City RC USA
Bellingham RC USA
Calgary RC Canada
New Braumfels RC USA
Paso Robles RC USA
Port Lavaca RC USA
Richmond RC TX USA
Sechelt BC RC Canada
Tallahassee RC USA
Trail BC RC Canada
Tyron RC USA
West U RC TX USA
San Miguel Midday RC Mexico
Districts 4160, 6060, 6200, 6940, 7670
& THE ROTARY FOUNDATION (Ashley & Lauren)

HUGE THANK YOU’s to:
Cedesa, (especially Holly, Chela, Saul – The TEAM!!), & our family members who put up with long, late hours…
Sapasma (Camilo, Waldo, Alva, Juan Jose & the other promoters)
Fondo Verde
Alberta Govt’s Community Initiative Program (BC Canada)
The many private donors/supporters
Our Suppliers, especially Raul from Hierro Comercial Dolores Hidalgo, Eric our Herreria & his boys, Jesus our sand guy, Madera Providencia, Cemex, Talego, Don Pedro,
Our Banks: Frost Bank, Bancomer, Monex, Intercam, CI banco,
Our accountant (wish we had her in the early days) : Liliana
Our publicity: Atencion!,
Members & Board of San Miguel Midday, for continuing support, attending Inaugurations, making speeches on behalf of the project, attending meetings with govt, fundraising!
Lee Carter: answering all the tricky finance questions

 &

MASSIVE THANKS to the men, women & children in all of the participating communities – for showing us your strength, courage & commitment to improving the lives of yourselves & future generations - living with such dignity under incredible hardship.


Numbers:

587 Cisterns
19 Communities
Ie 4000+ family members (+ other school & kinder children)

Total Funding Summarised
Rotary US$229047    (including direct grant private donations)
SMCF US$10614
Sapasma mxn$870399 (ie approx. US$67000)
Fondo Verde mxn$150,000(ie approx. US$11,500) + US$21,850
Other donations US$1000

(total approx. US$341,011) 

To be Completed May-Jun 2012 11 Cisterns

Summary of Funding
San Miguel Community Fund $5911

Tierra Blanca 11 cisterns

Completed Jan-May 2012 169 cisterns in 8 Communities

Summary of Funding
Global Grant Rotary $65,300
Direct grants & donations $21,147 breakdown as follows:


Tallahassee US$10k club & $2.5k private donation
Port Lavaca  US$6k
Peggy Purcel US$462.45
Pancake breakfast fundraiser $14950pesos
Excess funds from Port Lavaca/New braumfels proj. $11420pesos
Excess funds from Cap II proj. $487pesos
Excess funds from Bellingham water proj. $1163.5 pesos
private donation $250pesos

La Tinaja 22 cisterns
Cruz del Palmar 41 Cisterns
Guerrero 20 Cisterns
Tres Esquinas 24 Cisterns
Tierra Blanca 23 Cisterns
Corralejos 15 Cisterns
Vivienda de Arriba 10 Cisterns
Los Torres 14 Cisterns

Completed Nov 2011-Jan2012 60 cisterns in 5 communities

Summary of Funding
Sapasma mxn$435399
Chris Hosford private donor US$500

Los Torres 18 cisterns (Phase IV in this community)
Presita de Santa Rosa 21 Cisterns (Pilot paid for by private donation - thankyou Chris Hosford, 20 cisterns funded by Sapasma)
Cienega Juana Ruiz 18 Cisterns (Phase II in this community)
Lomas de Cocina 2 Cisterns
Cinco Senores 1 Cistern

Completed March – Jun 2011 134 cisterns in 6 communities

Summary of funding
Rotary $44,000
Fondo Verde mxn$150,000
Sapasma mxn$435,000

Tierra Blanca 28
Juan Gonzalez 22
funded by Global Grant from Baton Rouge Capitol City RC & District 6200 US$33,500
(completed June 2011)

Tierra Blanca 14 - direct grant donation from New Braumfels RC $2k, & Port Lavaca RC $7k
(completed June 2011)

San Lorenzo 4
Cinco Senores 11 (incl pilot in JG)
Fondo Verde Mxn$150k
(Completed June 2011)

Villa de Guadalupe 27
Cienega Juana Ruiz 26
Sapasma mxn$435k
(completed June 2011)

Villa Pilot x1
Cienega Pilot x 1 
Bellingham RC US$1500
(completed June 2011)

Completed Jan 2011 – March 2011 25 cisterns
Summary Funding
DSG Tallahassee $3800,Tallahassee RC$6000,Walla Walla $7000
Vivienda Urbana (Cap II) 25 cisterns


Completed Jan 2009 – Jan 2011 Total 188 cisterns in 6 communities.
Summary Funding
Rotary$81,800
SMCF$4,703
Fondo Verde$21,850
Skymed $500
total funding = USD $108,853
Palencia 21 Cisterns $7k (+ balance of excess from other projects)
Capaderillo 40 Cisterns FV US$21850
Cruz del Palmar 28 Cisterns combined $24700
Vivienda de Arriba 17 Cisterns
Montecillo de Nieto 30 Cisterns $16700
Los Torres 52 Cisterns (27+4+17+1+3) Including $21,700 + 12,200+smcf US$2468+ smcf 2 U$2235  
= 188 cisterns (& 4 rotoplas tanks)

Saturday, April 28, 2012

Report of 6th visit to Guerrero


Indigenous dancer at Guerrero Inauguration

Where: Guerrero
When:  28th April 2012 11-2
Who Saul & Chela (Cedesa) many community members + members from other communities
Lisette & Miguel (personally attended ) a visitor from Codemac (human rights organization) (& member of the Water coalition)

Purpose:   Inauguration/celebration of the completion of 20 cisterns in this community

I was unable to attend this inauguration as I was in Mexico City, Chela related the following to me

There were representatives from 8 communities including Guerrero.
People attended from Pena Blanca, Palmita II, Juan Gonzalez, Vivienda Urbana, Capaderillo, Presita de Santa Rosa & Cruz del Palmar. These people were there to support & strengthen Guerrero as they have had (& continue to have) issues with land rights.

The format for the day was essentially the same as La Tinaja, with introductions, reflection of the greater project, then specific retelling of this project by members of the community.

The dancers at this event were indigenous dancers with plumes on their heads & indigenous costumes etc, this community is the first to include indigenous culture (which is largely lost in this region).

Ribbons were cut on various cisterns during a walking tour.

Confetti!!
There were many balloons & streamers decorating the community & the cisterns, & of course the celebration concluded with a banquet of the usual delectable delights.



Tuesday, April 24, 2012

5th Meeting at La Tinaja re Water Cisterns & 1st meeting at Peña Blanca re water cisterns


Where: Peña Blanca community (beside Kinder)
When:  24.4.12 approx 10.30-12midday
Who: Holly, Laura, (visitors Mark & Margaret, Seth & Christina) & 17 community members (incl 1 man) + 4 kids & 3 dogs
Purpose of the meeting: To informally meet with the community to discuss possibility of running pipes from the kínder school roof to the 10,000 litre plastic tank which has been supplied by Desarrollo Social.

& 1st meeting at Peña Blanca re water cisterns
Summary of the visit:
Holly & Chela had previously visited this community out behind La Tinaja, during the visit the lack of water was discussed & the community mentioned they had a large Tinaco that is not currently hooked up to collect water, it is to be filled by Pipa (water truck) deliveries.

The problem is the road is very bad (the worst road any of us have been on, including Chela), the pipa truck had not been yet & during the rainy season it is unlikely the truck would be able to make it.

The tentative suggestion was made re the possibility of connecting the tinaco to a roof collection system & we were visiting on this day to determine feasibility & talk more about possibility of a cistern project in this location.

Holly had invited with Cedesa “volunteers” Mark & Margaret (who live in Guanajuato part time) & they in turn had invited Seth & Christina (who live in Gto & wanted to know more of the work of Cedesa, they have started the “Tianguis Ecologico de Guajajuato”)

We met at the closest Pemex station, as the road is so bad we needed to use Seth’s jeep & leave our cars to be watched by the Pemex guys, we all piled in (literally) & headed off.

The road to Peña Blanca is off the road to La Tinaja, & travels out behind LT. It is indeed the worst road we have travelled on with large boulders, rocks, dust puddles etc.

We met with the gathered crowd at the Kinder & saw that he Tinaco is up hill from the kinder, & outside the perimeter. Following are some facts we gathered:
  • Approx. 50 families in this community
  • They are “tercieros” essentially share croppers, they get to live on the land of the owner, for the price of 30% of their crops per year
  • The landowner has irrigation well but the people have no wells except hand dug wells & springs in the river which dry out during the year
  • The teeth of the people seem to be fine, no evidence among those gathered of fluoride damaged teeth.
  • There are 3 kinders & 1 primary in this community
  • They applied for 2 tinacos from Desarollo Social, to be filled with Pipas wkly to provide drinking/cooking only water for the 50 families, DS gave just one.
  • Today – coincidentally was the first day they had had water delivered, a pipa with 10,000 litre capacity arrived as we were meeting, & began filling the tinaco (the delegada accompanied the pipa, so her husband spoke with us)
  • We did not know if the 10,000 ltre truck was full, they were still pumping when we left.
  • They would like individual family cisterns & have begun the process to join COCIRA (the citizens council) & understand that participation & working together is mandatory.
  • The roof of the kinder was peaked. It looked to be approx. 4mt x 4 mtr ie approx. 16m2
  • The roof of the neighbouring church was much bigger, maybe 12 mtr x 4 mtr?

We did not run this meeting in the normal fashion, rather as a q&a session, asking for their suggestions & answers to our questions.

The possibility of moving the tinaco to the space by the church was discussed, as it would fill much more quickly & therefore provide much more water during the rainy season. Also it would not work where it is currently & would have to be downhill from the kinder – with no obvious spot.

They all agreed they would love to do a pilot training session to construct 1 or 2 cisterns beside the church to capture water, we explained we have no resources currently but will keep looking.

Ultimately they said, they were very keen to have individual family cisterns like they had seen in La Tinaja & Villa de Guadalupe, they had spoken with the people of these communities & knew a little of what was involved, & were motivated to do what it takes.

We gave them “homework” to ask the Priest if he would ok the construction of cisterns beside the church so that at the next meeting/assembly they can begin planning.

Mark then headed off with about 15 of the women & children to walk across the hills to La Tinaja to attend the Inauguration which was about to start.

The rest of us said our goodbyes, agreed to make an assembly time, & crammed back into the jeep for our bumpy ride to La Tinaja.


Where: La Tinaja community (beside Health Clinic)
When:  24.4.12 approx 12.30 – 3.50 pm
Who: Holly, Chela, Laura, (visitors Mark & Margaret, Seth & Christina) & 45+ community members (incl 4 men) + 16 kids & 2 dogs

Purpose of the meeting: Inauguration of the Water Cistern Project – Calgary Global grant 25437+direct grant – 1 pilot cistern + 21 Family cisterns

Welcome balloons & a welcome poster guided our way along the road to find Chela, who had driven directly & was there with the community waiting for us… we all kissed & shook hands hello & then waited for Mark to arrive with the women & kids from Pena Blanca arriving over the “hill” (read rocky mountain!).

There were tarps strung to the shelter structure to créate more shade (in the desert!) & a large sound system set up, chairs all arranged, people waiting, children chasing eachother around… Photos of the participants had been placed on a large sheet of ply (which had served its original purpose as reinforcement for the cistern construction process).

Mark arrived & the music started, with a line up of Young teenage girls doing a cultural dance…acting as woman & man…The dance had obviously been well rehearsed & despite the extreme heat & shy glances to eachother, we all enjoyed it.

The Delegado(?) introduced us all & today’s agenda, there were people attending from Palmita II, Corralejo, Pena Blanca, San Lucas (& obviously La Tinaja)

Audelia – the COCIRA rep. & co-ordinator of the Project, made her speech, thanking all who were accompanying them today, on this important day as they conclude their first community Project. She thanked Cedesa & Rotary for their contributions, & for heping make this a “work of develpment – we are lacking much but together we can work together for a better way of life for our community”…
She spoke eloquently & without hesitation.

Alicia (another prime organiser in the Project) said she wanted to describe the process, how it had come about & how it went. She said they had first heard of & seen wáter cisterns at Vivienda de Arriba, that they had gone as community reps to visit Cedesa & Rotary & had asked for our assistance. We had told them yes, if they bring a “solicitud” & Saul had helped them to créate one, for dry toilets initially, since their houses are so close together there is no “wilderness” to go to the toilet in, & they dont want to continue to pollute the river (when it is actually running) as that’s where most people go to the toilet.
They also later asked for help with Cisterns. The cisterns came sooner  & “it is a dream to have these cisterns at our houses, I didnt think this would eer be , it arrived in reality, we  got “organised” & worked & nothing came for about 2 yrs , then 21 of us were still working & now we have cisterns – we are still working to get dry toilets. We enjoyed working in groups, some were faster than others but we all got there.


Interestingly Mark, as an aside, asked me if Alicia liked to talk as she seemed to be going on & on (especially if spanish is not your 1st language), & I pointed out that, actually no, she is very shy, she would have been stressing about this moment for days, but that she was giving it her all to describe to everyone how positive the experience had been. This is something we keep seeing, young women gaining confidence in themselves after proving to themselves they can do it…a very big bonus of the Project/process.

Chela spoke then – as some of the communities had come to today’s event to learn more about inaugurations but also about the process of joining the Citizen’s council. She asked one of the older communities to explain to the new communities the process to join. Including holding community assemblies, collecting lists of names & signatures, delegado’s stamp – presentation of the soliitude to become part of COCIRA etc.

She asked them all to call out names of the communities they knew that already made up COCIRA.
All of the communities were listed (22 of them) + the new ones in process, hence reinforcing the connections of everyone present. Some of the new ones in process are La Joya, San Lucas, ex Hacienda Pena Blanca, & Ejido Pena Blanca.

Chela involved everyone in discussions about their prioirities in life.
What’s important to you? She asked
The families/people
Their land
Their customs/traditions & way of life (& devotion & dances)
Organisation/taking decisión by assembly

She explained that the Project was an important step to bring them altogether to work in groups & learn the benefits of organisation.

“we visit the región with eachother to see how we can work together to improve our way o life”
For example – the road to Pena Blanca is really bad & is the only access for this community, at this point someone joked that it was so bad that Mark had chosen to walk rather than ride in the jeep with us – everyone laughed at the irony.

The representatives from the community of San Lucas were given the op. to speak, they also wish to join the efforts to receive assistance with finding resources for cisterns & toilets through participation on the citizen’s council. Ex Hacienda Pena Blanca, Ejido Pena Blanca, Palmita II echoed this.

Corralejo was asked to explain the process they have been following to join the council, including attending assemblies, they organised meetings within their own community & appointed leaders who can speak about their needs, “take agreements” & requests to communicate at the regional meetings & exchange info back to their community. Part of it is to work on economic help together, but mostly to worktogether to learn how to organise. They needed to advise everyone of the upcoming meetings, write an Acta (essentially an application to join), have it authorised by their delegado (elected community representative), they are learning the process with Saul & Chela.

It was the new people learning from the older hands, the process of organisation/belonging to this citizen’s council.

At this point there was a mass exodus & the women & men of La Tinaja quickly returned carrying very large buckets of  tortillas (blue & normal) all wrapped in brightly embroidered cloths, huge pots of rice, beans, mole, nopal etc & garafons of agua fresca…

After the feast we made our way to several completed & brightly festooned cisterns for the ribbon cutting. When we commented how straight & fine these cisterns were, many women blushed & said they had made them themselves (without the men!)…

We needed to leave the procession early & headed back to the cars, only to be told of a special cistern with Guadalupe painted on the side, back we went & found Guadalupe emblazozned on the side of the cistern, beside the barbed wired washing line…

Crammed back into the car & headed back to the highway.

Submitted by Laura Stewart

Thursday, March 29, 2012

Report of Regional Meeting & Inauguration Cruz del Palmar


Where: Casa of Cata in Cruz del Palmar (& 3 other family casas)

When: March 29 2012 11am – 4.20pm

Who: Chela, Holly, Saul (Cedesa) Laura, (Rotary), + more than 158 people.

Purpose:

  1. Regular Regional meeting of the now 22 communities part of the Consejo – Cocira formed as a result of the Water Cistern Project.
  2. Inauguration of the 41 cistern project part of the Global Grant 25437 funded by Calgary RC & Alberta CIP & combined with Direct grants from Tallahassee RC, Port Lavaca RC & private donations, as well as excess funds from previous water cistern projects.

Holly & I arrived a little late at 11.40 & the meeting was in full process. There was a huge gathering of people seated & standing & participating in the discussions.

The roll had already been “called” & a list of communities & numbers of representatives was already made. Attendance was listed as follows:-

Corralejo 5, Pena Blanca 18, Capaderillo 3, La Tinaja 16, Tierra Blanca 3, Artesanos 3, Juan Gonzalez 17, Palmita II 14, Vivienda de Arriba 4, Villa de Guadalupe 8, Vivienda Urbana 5, Guerrero 2, Magueyes 2, Presita de Santa Rosa 10, Los Torres 3, San Lorenzo 3, Cienega 5, Cruz del Palmar 31, Montecillo de Nieto 4, La Joya 1, Banda 1. (there were more late arrivals but these were not recorded by community).

The Co-ordinator had been chosen – Roberto & record takers were taking notes for each community as well as for the Consejo.

The agenda had been decided & listed:

  1. Presentation & Introduction
  2. Programing of regional meetings, micro regional meetings & community direct attention assemblies.
  3. Sanitarios secos update re resources
  4. Cistern project – inaugurations/ next project with Sapasma
  5. Pipa Communitario
  6. Diplomado de turismo Rural
  7. Report re Codecin
  8. Inauguration of 41 cisterns at Cruz del Palmar

Item 1:This had already taken place (hence the list of attendees above)

Item 2: Programming of regional meetings, micro regional meetings & community direct attention assemblies.

After some discussion it was agreed that micro regional meetings were ideal to discuss issues closer to each community & with smaller more productive groups enabled. The list of micro regions was drawn up, & each decided when they would next meet, they will meet on a 2 monthly basis.

Regional meetings will be held every 3 mths (ie qtrly) unless there is a special meeting called.

Community direct attention/organisation assemblies will be every month with Saul or Chela attending each one.

Traspatios (backyard production) & health workshops will continue in each of the communities that wishes them, with other Cedesa “specialist” promoters, ie Juana for health, & Benigno for backyard production.

The special training workshops will also continue at Cedesa, with the next one being on alternative construction techniques, this one is aimed at the young men, many of whom are currently unemployed, to teach them inexpensive alternatives to the normal brick construction. They will learn rammed earth techniques as well as adobe. The idea being as a team they can assist eachother to construct housing for themselves. Traditionally young men in this state go to the USA to accumulate enough money to begin to build themselves (& their new families) a house. We know how fraught this tradition is & in attempt to offer alternatives this new workshop is being offered.

Micro region 1 – close to the Presa. Next Meeting 18/4 10am at Vivienda Urbana

Capaderillo, Guerrero, Vivienda Urbana, Presita de Santa Rosa

Micro region 2 – Next Meeting 16/5 10am Montecillo de Nieto

Montecillo de Nieto, Los Torres, Cruz del Palmar, Banda, Artesano, Magueyes

Micro region 3 – Next Meeting 25/4 Juan Gonzalez 10am

Vivienda de Arriba, Tierra Blanca, Juan Gonzalez, San Lorenzo, Villa de Guadalupe, Cienega, La Joya

Micro region 4 – Next Meeting 23/5 10am La Tinaja

Corralejo, Cinco Senores, La Tinaja, Palmita II, Pena Blanca

General Assemblies, or Regional meetings will be every 3 mths, the next one June 28/6 at Guerrero 11am.

Item 3: Sanitarios Secos

The work continues on this project, the funding has been promised but they are still working through all the requisites to receive the $$ & begin the actual project.

Item 4:

Cistern Project Inaugurations:

Cruz del Palmar today, La Tinaja Tues 24/4 at 11am, Guerrero Sat 28/4 at 11am (3 Esquinas to be advised).

A commission from Cocira will attend the inauguration in Guerrero in solidarity.

Sapasma next project:

Holly advised Waldo has said a next Sapasma project is likely within the next 2 months. Sapasma currently has a policy of providing cisterns only to communities without water, not to communities with Contaminated water, Cocira would like to discuss this with Sapasma, ie to see whether this can be changed, as it is essential that people with contaminated water have access to safe drinking water, even if they have well water for domestic use.

A list of priority communities was created, but depends on the existing policy of Sapasma & whether that can be changed.

Action: water tests need to be done at the following communities – ie not yet tested

La Joya, Corralejo, La Tinaja, Palmita II, Vivienda Urbana. The cost to the communities for these tests is $300 pesos, $150 for arsenic test & $150 for Fluoride test. These costs are to cover the consumables for the Cedesa Lab ie bottle, testing strips, chemicals etc. Chela asked that each community ask families to contribute even 5pesos each, to cover these costs.

Item 5: Pipa Communitaria

It had previously been proposed by Sapasma that a plan for the Consejo to operate their own Pipa (water truck) for deliveries of water to their own communities could be put into place. This has been discussed at great length in previous assembly & each representative has spoken with their communities. Each of the communities were asked to comment & vote on the proposal, there were many comments, “the purpose of cisterns is to collect rain water, which is pure water, it makes no sense to fill the cisterns with other water & will be very complicated to administer” “we don’t know the exact costs but we know it is likely to be expensive & it will be very complicated” “we just want rain water or people will not value it & will waste water” “it will be too complicated, we are many communities & it will be difficult to administer & control” “I don’t think it is viable with all the issues that could pop up, like a broken pump, no electricity, lots of potential expenses” “lots of responsibility & a lot of work” “difficult to prioritise deliveries, we could have lots of people wanting water at the same time & this would mean competing against eachother, & risking solidarity”

The vote was unanimously “NO”.

A commission will go to Sapasma to explain the reasons for “NO” vote & make alternative suggestions for resolving the issues - & work hard on getting existing Pozos(wells) functioning – in Los Torres, Cienega & Montecillo de Nieto – this will cut down the number of families without water significantly.

Also, extra pipa deliveries need to be asked for for the communities without water in Villa de Guadalupe for example.

At this point an additional item was added – discussion on ethics & values. Chela worked with the crowd to discuss the value of working hard to improve your community & your region, working with good heart & good conscience.

Item 6: Diplomado de Turismo Rural

Cedesa is hosting another rural diploma similar to the water one held 2008/09. It is described as follows:

Diploma course on Sustainable Rural Tourism, taught by Dr. Felipe Macias, University of Guanajuato (Social Science and Humanities)

Module 1 – social organization

Module 2 – sustainable energy in the rural environment

Module 3 – Territory and natural resources

Module 4 – Gender, environment and sustainable development

Module 5 – Landscape and special aspects of the countryside

Module 6 – Reception, services and goods to offer to visitors

Northern Guanajuato is diverse, not only because of its people and the natural reosuces, but also because of the ecology that provides food, medicine, fuel, rest, tranquility and recreation for its inhabitants. Without a doubt, rural areas have much to offer the urban population, including goods and services and the opportunity to share knowledge and experiences. Campesinos are the ones who protect, maintain and take care of natural ecosystems, especially the water, soil, flora and fauna and cultural heritage. Rural tourism includes actions that teach/confirm respect for the environment and natural resources as well as an opportunity for campesinos to improve their socio-economic situation.

Item 7: Codecin – Coalition of the Cuenca

Cedesa & representatives from Cocira are part of a coalition of the Cuenca (the region that includes the 7 municipalities sharing the same aquifer). They are working on various issues including maintaining conservation & defence of the aquifer & defence of the native seeds. This coalition is made up of many national organisations & is beyond just San Miguel.

At this point the assembly concluded & the Inauguration began.







Cata described the agenda which included first a banquet & rest & relaxation (after the long meeting), we then headed off to visit 3 cisterns nearby.

The 41 cisterns in this community were completed in record time, 3 wks to construct all the cisterns, which is an average of 2 cisterns per group per week.

The participants receiving the cisterns spoke their thanks at each of the houses. A huge thanks was extended to Rotary both local San Miguel & the international clubs who have made this project & continuing process possible. The speakers spoke with love about their cisterns & the difference it will make to their lives.









Two of the cisterns had been amazingly decorated. The first one had a very cute cobbled path around the circumference of the cistern, with another width of garden defined by large jagged rocks. The garden was filled with lillies & the cobbled path included specially selected rocks found in the dry river bed nearby. They had even created a little bridge going over the space where the water from the discharge would flow when they clean the cisterns out…There was also a little stone carved deity which they had found while excavating dirt to make the tepetate bricks in the area, he was placed looking over the tap. It was topped off with a full glass bottle of coke, & the woman joked that when her children & grandchildren come to visit they will be very happy to drink fresh water instead of the unreachable coke.

The last cistern was also incredibly decorated, this one had coach lanterns placed evenly around the top rim of the cistern, it was surrounded by a ledge of cement with little stone carvings placed evenly watching, it was topped off with a very ornate metal cross with a plastic baby doll attached, & with a terracotta bird watching on.

There were streamers & balloons & a ribbon strung across a metal arch way… Chela asked me to say a few words, I was choked up & could barely get any out but managed to congratulate the large crowd on their accomplishments in the last 3.5 yrs, beyond just the water cisterns, to have organised themselves to continue to have council meetings of this size & continue to work on their issues is a mammoth achievement.

Chela spoke & explained this is likely my last project since I am moving to Mexico City with my family. I invited them to visit us in Mexico City & couldn’t get any more words out with tears streaming. Flashing past were many memories of where this all started, all the zillions of emails & huge support from Bill Webb in Tallahassee & the many other clubs, Districts, Foundation & organisations that have supported these communities. How these communities continue to have faith that their work will be rewarded & how it has been.

The ribbon was cut & confetti was tossed. Cheers went up, & Holly & I made our excuses & raced off.

I really wish that Bill, Norman, Skip & all the members from all the other clubs that have been involved in this project from the start could have been there with us, but actually in a huge way you all were!!

Love

Laura

(As an addendum, 3 of the women from Los Torres were at the assembly, they bought with them a list of 12 more families who would like to receive cisterns, this will bring the total to 82 out of 91 families, & will be the last phase – we have decided to include them in this final project, bringing the project full circle – Los Torres is where we started & will be where we finish this final project – ay carray!)