Wednesday, April 5, 2017

Rotary Achieves Close to Half Million Dollars investment in Clean Water

5th April 2017
Report By Lee Carter, Rotary San Miguel Midday

Rotary San Miguel Midday. in a cooperating partnership with Centro de Desarollo Agropecuario (CEDESA) & the families/communities involved, have built more than 1,000 rainwater catchment cisterns in 54 rural communities within the Independence Aquifer of central Mexico. 

That means 1,000+ families in & around San Miguel now have contamination free water for drinking & cooking for the rest of their lives & the lives of their grandchildren. 

Also achieved as a result of the ongoing investigative efforts of Dr Ortega (of National Autonomous University of Mexico - UNAM), & his findings of the contaminated ground water resulting from depleted Aquifer in San Miguel & the surrounding area. The region's aquifer is contaminated with concentrated excessive levels of arsenic & fluoride (often more than double the levels considered safe to consume, according to the World Health Organization). 

Arsenic & fluoride are not detectable by smell or taste. 1000's of people are unknowingly ingesting toxic water.

Since 2009 San Miguel Midday Rotary  has managed the investment of almost USD$500,000 to help alleviate the problem, & we are just getting started! 

In order to provide clean water to poor rural families, Midday Rotary developed a program whereby Rotary provides the funding & project management to build rainwater catchment cisterns; CEDESA, provides technical expertise, community development skills & training; & labor to construct the cisterns is provided by community members/recipients. 

Rainwater is collected from roofs in a 12,000 liter, ferro-cement tank next to a family home. During the summer rainy season, ample water can be collected & stored to serve a family of seven until the next rainy season. 

Because they are built above ground, the cisterns are easily accessed for maintenance. A three-day education workshop highlighting the importance of water in daily lives, conservation, & maintenance of the cisterns is an integral part of the program.

There is a need for many, many more cisterns; there are at least 10,000 more families in the region whose health & well-being will benefit from replacing contaminated well water with rainwater. 

Rotary, collaborating with CEDESA & the communities themselves, intends to continue to work with international Rotary clubs & The Rotary Foundation (TRF) to provide funding for as long as there is demand for the rainwater collection projects. 

100 more cisterns are scheduled for construction under the current global grant, a partnership with the Rotary Club of Simi Sunrise & D5240. The next grant to build an additional 200 cisterns is already being planned. We hope that we can continue to work with D5240 & its clubs will continue to be our international partners.

Midday Rotary’s cistern program reaches well beyond every human’s right to clean water for drinking  & cooking. The thoughtful implementation of this program has proven to be highly effective in organizing communities to collectively analyze their problems & seek solutions. 

Anyone familiar with life in Mexican rural communities, understands that cooperation rarely exists outside the immediate family. And yet more than 1,000 families have managed to work together building cisterns for & with each other. Participation is voluntary. One person from each family commits to 250 hours of meetings, training, & labor. 

Working in teams of six they build one cistern a week for all six families within their group. Personal investment & self-determination are key to the success & sustainability of the program. Communities stay organized by taking advantage of other CEDESA initiatives such as back yard gardening, bee keeping, holistic healing with medicinal plants, & the list goes on.

70% of the cistern program to date has been funded by grants from 23 International Rotary Clubs, 12 Rotary districts & TRF. The remaining 30% has come from strategic alliances with various foundations & the local municipal water board. Significant funding has come from the Lotus Foundation, San Miguel Community Foundation, & the Alberta Canada government. 

It is a great pleasure to see so many different & varied organizations commit to assist this program to support  campesinos as they work to solve their problems & collectively transform into independent & self-sustaining communities.


For more information, please contact Lee Carter, VP of Community Projects: leecarco@gmail.com



San Miguel Midday Rotarians at the 1000th Cistern Celebration 



Chela Martinez of CEDESA and Lee Carter of Rotary San Miguel Midday


Ribbon Cutting Ceremony at the 1000th Cistern Celebration


 agua dulce



Rainwater Harvesting in the Independence Aquifer



Lunch at Vivienda de Abajo – 1000th Cistern Celebration

By Lee Carter, Rotary San Miguel Midday


Thursday, February 23, 2017

Water Harvesting Education Program in Los Platanos

Over 30 participants attended the 3-day Water Harvesting Education Program  (February 20-23) in Los Platanos. The participants were from the communities of Los Platanos, Vergel de Guadalupe & San Cayetano in the municipality of San Luis de la Paz in the state of Guanajuato.

This was the first time Rotary Midday of San Miguel de Allende & CEDESA have visited this community; invited by volunteer community organizer Lucha Villafuerte & Father Zesati to help provide solutions to the contaminated water in the Independence Aquifer.

On day one of the program, between singing, dancing & eating, the participants learned how important water is to life & how to avoid contaminating water in the way they use water . Participants were astonished to learn that only 2% of water on Earth is suitable for human consumption & resolved to use it wisely. The ‘grandmothers’ in the group spoke to us about how they used water long ago which caused the group to reflect on the wastefulness of modern-day usage.



Day two was full of dynamic activities focused on how water in these communities became polluted & how this affected health.  The day started with participants creating a mural of their watershed & learning where their water comes from. They discovered there were three types of pollutants; chemical, mineral & biological, some of which they have control over & some they do not.

The promoters showed photos of adults & children with various stages of fluorosis & arsenic poisoning (fluoride & arsenic both contaminate local water supplies), which caused much discussion. A guest from a nearby community shared the problems her own community is experiencing; the tap water is highly contaminated & has caused several cases of cancer, kidney failure, & death. She reported the municipal government denies that the health problems are caused by city water. She is working with a committed group of 8 concerned citizens to help bring awareness of this serious issue. She heard about the work of Rotary and CEDESA & came to seek help and resources.



Day three of the program began with an original song & sketches about why we shouldn’t drink or cook with tap water. CEDESA & Rotary Midday member, Lee Carter, got in on the act with a humorous role play about a community rallying around clean water for their children.  The participants concluded that harvesting rainwater in cisterns was the best solution to their problem. They were enthusiastic about starting cistern building the following week.

At the conclusion of the 3-day prog. the participants agreed the problem of contaminated water is everyone’s problem & they will work together to build cisterns & to spread awareness in their communities.

Eighty-one cisterns are in the process of being built by communities in the San Luis de la Paz area.

Submitted by: Wendy Coulson (Rotary Peace Fellow/Curriculum Developer)








Saturday, October 29, 2016

Celebration Charco de Araujo October 29, 2016

Today we celebrated the completion of 14 cisterns & 3 tinacos in the community of Charco de Araujo. 

This community is near San Diego de La Union & is the first community we have worked with this far north for several years. The area of eastern Dolores Hidalgo, San Diego de La Union & San Luis de la Paz has some of the most contaminated water in the Aquifer. It is for this reason that Rotary San Miguel Midday took the decision to expand its geographical service area with this grant for 319 water harvesting cisterns.


The rural grassroots organization, UCCANG, is working as a partner with CEDESA & Rotary in these projects. UCCANG was founded approx. 35 years ago to work to resolve the issue of lack of potable water resources in the northern part of Guanajuato. They are well organized & managed by a board of directors from those communities. UCCANG helps us identify communities that are requesting cisterns & play a critical role in the project in addition to choosing beneficiary families. 
They have the responsibility of inspecting & verifying all cisterns are in 100% working condition before we have our community celebrations. They are also going to make a formal review six months later to follow up on maintenance issues & recommendations for cistern water disinfection. This is critical to the long term success of these projects.


Seven UCCANG communities attended today’s event. The program for the day included testimonials from the beneficiary families describing their experience in self-constructing their cisterns in work groups each consisting of 7 families. All of the communities in attendance performed songs or dances that remembered their cultural traditions. A wonderful meal, including carnitas (!), capped off the day.



In attendance were:

Chela, Ceci, Benigno and Meche from CEDESA, UCCANG directors & members of the local communities.  Nate, Fred, Beatriz, Gary, Wendy (who developed the project’s education program), Lee, & two guests from Rotary Midday, Carla Cadena (a Jovenes Adelante Scholar who is doing social service in helping administer the project), Edgarkis Crisostomo, (a Rotary Foundation Water & Sanitation Cadre volunteer from the Dominican Republic - who conducted extensive interviews with CEDESA representatives) came with us also.

After the event we all went to La Colorada, down the road, to see their progress in their project.

Submitted by: Lee Carter



Thursday, May 19, 2016

A Day at CEDESA


May 19, 2016

Yesterday, after going to Nombre de Dios with Chela and Abel, we returned to CEDESA for additional planning of our new global grant (GG1524911) for 319 more water harvesting cisterns in San Miguel, Dolores Hidalgo, San Diego de la Union & San Luis de la Paz. 

Present were Chela, Abel, Meche, Benigno, and Ceci.

We reviewed first the progress on the new education program & the principal objectives of that program. Meche has been working hard with Wendy Coulson to develop the program & didactic materials to go with that. We all agreed that in a nutshell our goals are to have people fully understand
1.       the reason for cisterns is lack of an improved water source or having water that is terribly contaminated with fluoride and arsenic.
2.      the cistern water is free from those poisons & they should never drink water from wells.
3.        they can improve their water & health even more by integrating disinfection steps to improve the cistern water & avoid any potential biological contamination &
4.       have people learn how to self-construct their water harvesting system & maintain it to get maximum benefit from it.

Those are our primary objectives for this project &grant. However we also will be using this opportunity to continue to develop the communities' capacity to work together to analyze their problems & seek solutions (resources). 

We'd like to build on this opportunity so that they can take advantage of other opportunities such as backyard gardens, natural medicine, beekeeping, & other eco-technologies such as gray water filtering & the eco-cina stoves. We'd like the cistern projects to continue to be the first step in the long process of community empowerment.

The education program is ready now to “beta test” in the first communities. We are going to start in Boca de la Cañada (San Miguel) in two weeks & then in Las Claveles (Dolores) after that. 

We will present the didactic materials in the “final draft” format & then make adjustments before going to press & printing enough materials to carry us through the project.

Everyone in the communities are enthusiastic & champing at the bit to get started. They all want to work through the summer rainy season in order to be able to harvest at least a little rain before the dry weather returns in the fall. 

CEDESA is going to work up a draft schedule next week so we can plan out each mini-project. They are talking about doing as many as four different communities per month. Yikes, that is going to be a lot of work for all of us!

As we worked through potential pitfalls & bottlenecks in this ambitious program, we realized that we would need another technician in addition to Benigno & Abel to be able to do the site visits in each community during the construction process. 

A great solution was devised that will also allow us to continue to develop our youth program in the process. We will select a young person in each community where we are working to become an expert in construction & maintenance of the systems. This person will do the project monitoring throughout the construction process & will be report & consult with Abel &/or Benigno as the mini-project proceeds. Instead of having a once a week visit from the technician, we will have someone there overseeing the construction on a daily basis as each group builds cisterns at each home. 

Once the project is complete we will be leaving behind “a community expert” who can continue to monitor cisterns & even assist in repairs as needed. We already have a budget for an albanil for the pilot week. Since each group is now obligated to provide an albanil throughout the mini-project including the pilot cistern week, those funds can be used as a stipend for developing our new community expert. CEDESA will be responsible for handling the payment process.

We also reviewed the financial resources available in the grant so that we could come up with a simplified billing plan. When we combine our organization budget with our education teaching budget, we have 2,400 pesos for Pre-Pilot expenses. For the Pilot stage of the project we have $4,750 in funds available. And for post-project monitoring & evaluation we have 900 pesos available. 

We budgeted for 11 mini-projects as we were developing the project but as the number of cisterns grew the number of mini-projects is likely to be 15 to 18 … thank heavens for our contingency budget!

CEDESA is to be responsible for tracking certain costs/expenses each month & reporting them to Rotary for reimbursement. They need to record all KM driven in CEDESA vehicles in executing the projects to be reimbursed @ 3.5 pesos / KM. They also need to keep all tickets from using public transportation so that can be reimbursed as well up to a total of $9000 for the project. We will also be providing an $800 peso phone allowance per month to be split up between the various promotors & technicians.

Equipment: We need to get the new vehicle as soon as possible. Rotary has $5,000 dollars to contribute to that. CEDESA has 30,000 pesos set aside as well. We are going to purchase one “very good” vehicle that will last many years into the future for project monitoring. We are going to invest about 10,000 pesos of that money in upgrading an existing vehicle. Even with two new vehicles in play, transportation will still be a headache for CEDESA. 

The electrode in the fluoride testing laboratory has failed & we are looking into replacing that. Initial quotations that Meche got are expensive … about US$1,500. We had not counted on needing this within the time frame of this grant. We will probably reduce our “tools” budget to get this back on-line &I will try to see if we can find outside resources to help cover this unexpected expense.

We are working to be able to get the communities on the edges of San Diego de la Union & San Luis de la Paz involved in this grant. To do so, the two “subgroups” will have to work under UCCANG. 

UCCANG is responsible for carrying out several functions … community selection, receiving solicitudes & for providing monitoring and evaluation for six months after the construction phase. Integrating them into UCCANG does not seem to be a problem. The two subgroups are SECOPA (Servicios Comunitarios de Pozos Ademada – San Diego Union) and CUVA (Comunidades Unidas Para La Vida y Agua – San Jose Iturbide).

Recently a well in the San Jose Iturbide area, in the community of La Cantera, was discovered to have radioactivity in the water. There has been a high rate of documented child leukemia in that town as well. Dr. Ortega of UNAM is studying the problem to determine if this is an isolated instance of industrial contamination or if it is going to be as a result of the ever-challenging problems we are facing in the aquifer. There are 120 affected families & the government is, of course, denying that there is a problem.


Submitted by: Lee Carter

Thursday, January 7, 2016

STATISTICS UPDATE DECEMBER 2015

WHAT WE'VE ACHIEVED TO DATE (December 2015)
Since the successful collaboration in Los Torres (3 phases), we have completed projects in Montecillo de Nieto , Cruz del Palmar, Vivienda de Arriba, Capaderillo, Palencia , Vivienda Urbana, Tierra Blanca, Juan Gonzalez, Cinco Senores, Villa de Guadalupe, Cienega & San Lorenzo, Presita de Santa Rosa, La Tinaja,Guerrero,3 Esquinas (near Palencia),Cruz del Palmar phase II,Corralejo,Vivienda de Arriba phase II,Tierra Blanca phase II...

New Water project team have to date completed projects &/or pilots in Los Magueyes, La Palma, Viviendilla, Exhacienda Peña Blanca , Exhacienda de Jesus(San Caytano & Adjuntas de San Jose, as well as La Banda

Presa Allende, Lindero & Alonso Yanez, plus in  Juan Gonzalez Phase II,  XH Peña Blanca Phase II, Vivienda de Abajo Phase II & San Lorenzo Phase II, Montecillo de Nieto Phase II & the work continues!!!

MASSIVE THANKS to the women, men & children in all of the participating communities – for showing us your strength, courage & commitment to improving the lives of yourselves & future generations - living with such dignity often under incredible hardship.

***Please see further gratitude extended at the end of this post

Numbers:

751 Cisterns 
29 Communities 
39 projects (this is counting each “mini project” also multiple phase communities)

Ie 4800+ family members (+ other school & kinder children) 

TOTAL FUNDING SUMMARISED:
Rotary US$317,588    (including direct grant private donations)
SMCF US$10614
Sapasma mxn$953353 (ie approx. US$73334)
Fondo Verde mxn$150,000(ie approx. US$11,500) + US$21,850
Lotus Foundation mxn$93530
Other donations to date US$1000
+ $750 in memory of Merle Howard 2015
+ $800 in memory of Gordon Logan 2015
+ $5000 donation from Walla Walla Rotary 2015.


(total approx. US$449,630)

IN THE PIPELINE:
Pending grant for $199,400 ie 314 more cisterns planned.
Participating: TRF + 10 Rotary Clubs, from 8 Rotary Districts + 3 Foundations
November 2015 – A new  Global Grant application was submitted to TRF for 314 cisterns at a cost of US$199,431. 

Ten percent of the budget is to fund a new educational component. Partners are TRF, Lotus Foundation, Simi Sunrise Rotary, Middletown Rotary, Grand Cayman-Sunrise, Nanaimo Rotary, Harlingen Sunburst, Titusville, Somerville, Grass Valley South, Districts 5240, 4160, 6930, 6600, 6940, 7980, 5190 and 3720 (Korea). Also San Miguel Community Foundation and Fondation Coup de Coeur (Canada).

Additional New Team Projects since last update Aug 2014 
Sept 2014 – start of new Global grant for $78,000 to fund 110 cisterns (we have actually stretched that to 124 so far as at Dec 2015) Partners are Lotus Foundation, Rotary Foundations, Eau Gallie Rotary Club and District 6930

The 124 cisterns completed as part of this global grant to date are:
October 2014 - Juan Gonzalez phase II – 16
January 2015 - Banda and Montecillo de Nieto phase II – 17
March 2015 - Vivienda Urbano (Abajo) Phase II – 10
April 2015 - Alonso Yanez and Lindero – 38
June 2015 - Presa Allende – 22
August 2015 - San Lorenzo Phase II 2
August 2015 - ExHacienda de Pena Blanca Phase II 19

2nd New Team Project - Completed July 2014 19 + 2 Cisterns from here included in Update Aug. 2014.
Summary of Funding
ExHacienda Pena Blanca 19 Cisterns

Lotus Foundation Mxn$72056 

(nb this amount was under budget & the balance will be counted in the next project planned - global grant)
Sapasma Materials Donation value mxn$82,954.69

Planned for ExHacienda de Jesus - which became San Cayetano 1, Adjuntas de San Jose 1 (*municipality of San Diego Union)
Lotus Foundation Managed by RSMM
mxn 15077


1st New Team Project - Completed May 2013 18 Cisterns
Summary of Funding
Chinook Rotary Direct Grant $5000 , 
Rotary of Middletown Direct Grant $3021  
District 7980 District simplified Grant  $2320
Rotary San Miguel Midday $200 
(total USD$10,541)

Los Magueyes 8 cisterns
La Palma 8 cisterns
Viviendilla 2 Cisterns (1 at school, 1 demonstration cistern at factory)

Completed May-Jun 2012 11 Cisterns

Summary of Funding
San Miguel Community Fund $5911

Tierra Blanca 11 cisterns

Completed Jan-May 2012 169 cisterns in 8 Communities

Summary of Funding
Global Grant Rotary $65,300
Direct grants & donations $21,147 breakdown as follows:

Tallahassee US$10k club & $2.5k private donation
Port Lavaca  US$6k
Peggy Purcel US$462.45
Pancake breakfast fundraiser $14950pesos
Excess funds from Port Lavaca/New braumfels proj. $11420pesos
Excess funds from Cap II proj. $487pesos
Excess funds from Bellingham water proj. $1163.5 pesos
private donation $250pesos

La Tinaja 22 cisterns
Cruz del Palmar 41 Cisterns
Guerrero 20 Cisterns
Tres Esquinas 24 Cisterns
Tierra Blanca 23 Cisterns
Corralejos 15 Cisterns
Vivienda de Arriba 10 Cisterns
Los Torres 14 Cisterns

Completed Nov 2011-Jan2012 60 cisterns in 5 communities

Summary of Funding
Sapasma mxn$435399
Chris Hosford private donor US$500

Los Torres 18 cisterns (Phase IV in this community)
Presita de Santa Rosa 21 Cisterns (Pilot paid for by private donation - thankyou Chris Hosford, 20 cisterns funded by Sapasma)
Cienega Juana Ruiz 18 Cisterns (Phase II in this community)
Lomas de Cocina 2 Cisterns
Cinco Senores 1 Cistern 
(**)

Completed March – Jun 2011 134 cisterns in 6 communities

Summary of funding
Rotary $44,000
Fondo Verde mxn$150,000
Sapasma mxn$435,000

Tierra Blanca 28
Juan Gonzalez 22
funded by Global Grant from Baton Rouge Capitol City RC & District 6200 US$33,500
(completed June 2011)

Tierra Blanca 14 - direct grant donation from New Braumfels RC $2k, & Port Lavaca RC $7k
(completed June 2011)

San Lorenzo 4
Cinco Senores 11 (incl pilot in JG)
Fondo Verde Mxn$150k
(Completed June 2011)

Villa de Guadalupe 27
Cienega Juana Ruiz 26
Sapasma mxn$435k
(completed June 2011)

Villa Pilot x1
Cienega Pilot x 1
Bellingham RC US$1500
(completed June 2011)

Completed Jan 2011 – March 2011 25 cisterns
Summary Funding
DSG Tallahassee $3800,Tallahassee RC$6000,Walla Walla $7000
Vivienda Urbana (Cap II) 25 cisterns


Completed Jan 2009 – Jan 2011 Total 188 cisterns in 6 communities.
Summary Funding
Rotary$81,800
SMCF$4,703
Fondo Verde$21,850
Skymed $500
total funding = USD $108,853
Palencia 21 Cisterns $7k (+ balance of excess from other projects)
Capaderillo 40 Cisterns FV US$21850
Cruz del Palmar 28 Cisterns combined $24700
Vivienda de Arriba 17 Cisterns
Montecillo de Nieto 30 Cisterns $16700
Los Torres 52 Cisterns (27+4+17+1+3) Including $21,700 + 12,200+smcf US$2468+ smcf 2 U$2235  
= 188 cisterns (& 4 rotoplas tanks)


FURTHER GRATITUDE IN THE FORM OF A VERY BIG THANK YOU IS EXTENDED TO:

A BIG THANK YOU to all the hardworking men & women belonging to the Rotary Clubs & Districts & the Foundation who have been part of this solution:

Ann Arbor RC USA
Baton Rouge Capital City RC USA
Bellingham RC USA
Calgary RC Canada
Eau Gallie RC USA
Middletown RC USA
New Braumfels RC USA
Paso Robles RC USA
Port Lavaca RC USA
Richmond RC TX USA
Sechelt BC RC Canada
Tallahassee RC USA
Trail BC RC Canada
Tyron RC USA
West U RC TX USA
San Miguel Midday RC Mexico
Districts 4160, 6060, 6200, 6940, 7670, 7980
& THE ROTARY FOUNDATION (Ashley & Lauren)
(not including pending project)

HUGE THANK YOU’s to:
Cedesa, (especially Beatrice, Abel, Holly, Chela, Saul – The TEAM!!), & our family members who put up with long, late hours…
Sapasma (Previous Administration - Camilo, Waldo, Alva, Juan Jose & the other promoters & the new administration)
Fondo Verde
Alberta Govt’s Community Initiative Program (BC Canada)
The Lotus Foundation (private donor)
The many other private donors/supporters
Our Suppliers, especially Raul from Hierro Comercial Dolores Hidalgo, Eric our Herreria & his boys, Jesus our sand guy, Madera Providencia, Cemex, Talego, Don Pedro,
Our Banks: Frost Bank, Bancomer, Monex, Intercam, CI banco,
Our accountant (wish we had her in the early days) : Liliana
Our publicity: Atencion!,
Members & Board of San Miguel Midday, for continuing support, attending Inaugurations, making speeches on behalf of the project, attending meetings with govt, fundraising!
Lee Carter: answering all the tricky finance questions in the past & leading the new team Alejandro, Denis & Alex, &  for the new Projects
Gary Reid for continuing to take excellent photos for us.




Monday, September 7, 2015

Global Grant Project Update August 2015

We have been very busy since our last post in July. 

In early August, there was a meeting of COCIRA in the community of Boca de Canada. It is a stunningly beautiful place in San Miguel. 

COCIRA has really become a strong organization and there is now a council of Directors who are anxious to move the group forward in many areas in addition to water harvesting. There are 12 Directors, a representative from 12 different communities. They are taking on the task of inspecting and evaluating all of the cisterns that have been constructed since 2009 when Laura Stewart began this long and enjoyable journey.

Boca de Canada is a new community with water problems. They have been attending COCIRA and other community meetings for several months now. New communities coming for the first time were Tlaxcalilla (no water whatsoever), Saltrillo (contaminated water and wanting dry toilets) and Begona de Progreso (contaminated water). Now they have the information necessary to go back to their communities and discuss the possibility of joining COCIRA and seeking various resources that come from being part of COCIRA and having a relationship with CEDESA. In addition to Rotary funded water projects, backyard vegetable gardens, health clinics using medicinal plants, apicultura (beekeeping) and dry toilets are among the many things that can be accomplished on a community level when the inhabitants come to gather to work in teams for the betterment of all.

Mago attended this meeting as the CEDESA representative as Chela has been sidelined with a knee problem. Mayra, Carolina and Hilaria came as promoters in sub-regions that have been set up to better serve the San Miguel municipality. Lee attended as Rotary’s representative.

Dates were established during the meeting to do “inspection and evaluation” of the Presa Allende project and to finish up the final inspections at Alonso Yanez and Lindero. The closing ceremony for Presa Allende was set for 22nd of August.

In August Mago traveled to Ex-Hacienda de Pena Blanca to finalize the organization and teams for this second phase project. There are 19 families participating and we are also supplying two 1,100 liter tinacos to capture rainwater at the houses of two much older persons who are not able to do the work necessary to construct the 12,000 ferro-cement cisterns. Benigno, the master cistern builder from CEDESA, will be the technical representative on this project and Abel is being trained to become the cistern technician for the San Miguel area.

Hierro Comercial delivered the materials for the pilot cistern in Ex-Hacienda de Pena Blanca for  two cisterns in San Lorenzo on August 22nd and construction began on August 24th. Lee delivered the plywood and took the "nipples" back to Eric’s so the heavy wire reinforcing could be welded onto the galvanized parts that penetrate the cistern walls. Alejandro arranged with the department of social development of the municipality to make water truck deliveries each week of the project as there is no water in XHPB to even mix the cement.

As planned above, on August 22nd we had our closing celebration in Presa Allende with more than 80 persons in attendance. Ivar, Alejandro and Lee went from Rotary. Chela’s knee is improving and she attended with Meche and another CEDESA visitor. 

On Aug 25th Alejandro and Lee went back to San Lorenzo and XHPB to deliver the reinforced "nipples" for the pilot cistern. This was a great opportunity to talk at length with Benigno about the construction process and the techniques and decisions the technical rep. needs to make in regards to how and where cisterns are located.

On Aug 27, Holly and Lee went to CEDESA HQ in Dolores Hidalgo to review with Chela the new education program that will be added to our next grant. Welcome back Holly! The eight modules were reviewed and we had time to talk about how this can be implemented by having promoter and then later COCIRA and UCCANG workshops to build enthusiasm for the program. Holly will be working hard with Rotary to develop the modules and copious auxiliary materials to distribute in the communities where we will be working.

On Aug 28th all of the new Presa Allende cisterns were inspected by a team of COCIRA representatives, Alejandro, Beatriz and Lee of Rotary and Meche of Cedesa . The new inspection program appears to be a very valuable activity as it gives us an opportunity to meet individually with every new cistern owner to reinforce the importance of maintenance activities and disinfection of the collected water. We are finding new ways to improve the projects overall and where to avoid problems.
  
On Aug 31, Alejandro, Beatriz and Lee went to see the progress in San Lorenzo where we were served a delicious breakfast of atole and gorditas. Abel from CEDESA went along with us and I was impressed that he is very thoughtful and dedicated to the success of the two current cistern projects. From San Lorenzo we went on to XHPB to check on the completed pilot cistern and to see where the next cisterns would be located. Because this community has so few construction workers (too far from San Miguel) we also needed to purchase some basic tools to lend to the project.

On Sept 1, Lee traveled back to XHPB to deliver the remainder of the tools needed and also the reinforced "nipples" needed for that week’s construction. This is the first project that we have undertaken since Saul left CEDESA (to develop his personal business). It has really been a little difficult because Saul used to take care of so many little details (taking and returning "nipples", for instance). He also had the "luxury" of having a CEDESA truck to be able to accomplish the many errands. CEDESA does not have a truck that can be used by Abel at this time. It has fallen on Rotary’s shoulders to do all of this detail work. Whereas I am happy to have a chance to work on and learn about every little detail, it is not practical that we do this for all future projects. Lee has been discussing with Chela (CEDESA) and our project partners for the next project of obtaining some additional grant money so that a truck can be available to the CEDESA workers in the San Miguel region. Saul used to be the promoter, coordinator, technician and all-around boy Friday for these projects. Moving forth and having different persons filling the different roles is requiring that we establish clear communication systems and cooperation to be able to operate efficiently. This mini-project is proceeding reasonably well - we are on a steep learning curve.



It was a busy month and I have not even reported it all!
Submitted by Lee Carter, Rotary San Miguel Midday, September 7, 2015.